Excavation by grab
Source:Internet Author:Unknow Pubdate:2008-04-29  
Zambo (Civil/Environme) 2 Dec 07 9:08
I have seen clamshell grabs used for dredging (silt or sand) and for rock (say 3-10 tonne blasted rock) but what about excavation. Is it possible to use a wire operated clamshell to excavate a stiff clay? Or is it necessary to excavate with hydraulic equipment and use the mechanical grab just for soil movement.

dicksewerrat (Civil/Environme) 2 Dec 07 15:26
If the clay is very stiff or dry, the clamshell won't get a good bite into the material. And this will make the excavating slower. Richard A. Cornelius, P.E.
WWW.amlinereast.com

oldestguy (Geotechnical) 9 Dec 07 17:41
He is right.

However, if equipped with teeth, these buckets can do some digging in hard ground, but have little down pressure to help.

字串2



They seem to be most common handling aggregates and other loose materials in stock piles where a long reach is needed.

I've seen them regularly in use to clean out excavations in confined areas where other equipment just can't reach.

civilperson (Structural) 10 Dec 07 11:26
Good operator can drop clam from a height required to penetrate clay or other "hard" digging.

dicksewerrat (Civil/Environme) 10 Dec 07 20:40
Good cable machine operators are hard to find these days. treat him/her right. Richard A. Cornelius, P.E.
WWW.amlinereast.com

BigH (Geotechnical) 11 Dec 07 21:30
They are also used in well foundations (caissons) for bridge piers in order to dig out the material for sinking the well foundation. 字串3

PEinc (Geotechnical) 12 Dec 07 11:03
I have seen many contractors go out of their way and spend lots of money trying to use a backhoe where a clam bucket should have been used. Most contractors don't even know what a clam bucket is.  Most equipment operators haven't ever done any clamming.  Those operators who have done clamming seem to be retired or dead.  Clamming is slow but sometimes the amount of material to be excavated is not very great and the clam may did it just as fast or faster than a backhoe.

PEinc (Geotechnical) 12 Dec 07 11:05
Sorry, I meant to type "dig it just as fast..."


(Click:

Previous:Gunite/Shot-Crete?   Next:Vertical Vessel Legs Design!!!
[Add TO Favorites] [TOP] [PRINT] [CLOCE WINDOWS]  
  Hot Article
·Haul Road Construction
·AGTEK Cut / Fill Factors
·Young Engineer Needs Help
·Retaining Wall Design Software
·Retaining Wall Design Software
·Footing Excavation Testing
·Dip In Road
·detention basin
·Civil 3d Help Book
·Retaining Wall Design Software
·I WANT PENETOMETER
·Cement Treated Subgrade
  Related Articles
·Vertical Vessel Legs Design!!!
·Shopping for Software
·Where to get a quick/cheap tra
·Design Spectral Acceleration P
·Autodesk Grading Objects
·Does anybody have any experien
·Steel Reinf. Take-Off Calculat
·Whats with all the diamonds in
·Digging under High Tension Ele
·Civil 3d Help Book
·Site Balence of Cut and Fill
·AGTEK Cut / Fill Factors
Power by DedeCms