|
 |
Testing of Erosion Control Products
|
| |
DATE:2008-05-25 12:01:30
CLICK:15
|
|
matthew88 (Civil/Environme)10 Jun 02 16:36 {Cross Posted to Flood/Storm} Is there anyplace that routinely generates test data for erosion control products or procedures (i.e., different kinds of materials for matting, planting techniques, different k
|
|
 |
Detention basins access ramp
|
| |
DATE:2008-05-25 12:01:17
CLICK:7
|
|
mayza (Civil/Environme)27 Feb 04 16:40 Hi, I'm from southern California and I'm looking for a soil binding material to be used on a detention basin access ramp (perm. access road). We have ones down here that are paved with asphalt but I was looking
|
|
 |
Filter fabric specification
|
| |
DATE:2008-05-25 12:01:14
CLICK:53
|
|
koodi (Civil/Environme)13 Feb 04 20:38 I'm considering specifying some yard drain/basins that are similar to a coffee maker (i.e. water drains through a conical insert with holes in it that can be removed and emptied). In additon the insert may be fi
|
|
 |
Existing Wastewater Lagoon Compacted Clay Liner Erosion Issues
|
| |
DATE:2008-05-14 12:04:22
CLICK:31
|
|
Allan17 (Civil/Environme)21 Aug 07 11:02 The existing lagoon was constructed in 1982 and is currently operational receiving wastewater flows from residential and industrial developments.The lagoon existing containment berms were constructed as compac
|
|
 |
E& S Controls along a stream bank?
|
| |
DATE:2008-05-14 12:04:12
CLICK:16
|
|
cfj104 (Civil/Environme)23 Apr 07 16:31 I have a project that is going to require the removal of a streambank to the base of the creek - what type of erosion controls have you used that may be applicable in this situation?The site is very constrianed
|
|
 |
Simple Grading of Swale
|
| |
DATE:2008-05-14 12:04:07
CLICK:32
|
|
SwampMuskrat (Civil/Environme)9 Mar 07 16:13 I have always had trouble with this: I am grading a swale with say 3:1 sideslopes and say 1% grade along the bottom of the swale. Let's just say it is 100 feet long. Does anyone have any helpful tips on ac
|
|
 |
advanced storm water treatment
|
| |
DATE:2008-05-14 12:03:36
CLICK:10
|
|
vicki932 (Civil/Environme)9 Oct 06 19:10 Are there cost-effective advanced sediment control technologies that are useful in San Diego, CA with regards to the new RWQCB Order coming out stating, "...the types of BMPs that are required to be implemente
|
|
 |
Riprap at pond edge
|
| |
DATE:2008-05-14 12:03:32
CLICK:32
|
|
kedpe (Civil/Environme)30 Aug 06 11:29 Hey guys-my first post: I've designed a fire supply and retention pond and called out 18" deep ODOT Type C (6"-18"; avg. 12") for the pond edges.The contractor wants to put #2 stone. Any experience? Thanks sarum
|
|
 |
Hydroseeding Surface Preparation
|
| |
DATE:2008-05-14 12:03:25
CLICK:21
|
|
captcavemn (Civil/Environme)11 Aug 06 14:28 I have a site on Southern Ontario where the ditches were hydroseeded in late October last year.The grass seed did not take very well, but the weeds did. I am trying to determine whether the ditch surfaces w
|
|
 |
Vacuum for Paving Millings?
|
| |
DATE:2008-05-14 12:03:21
CLICK:15
|
|
cfj104 (Civil/Environme)8 Mar 06 9:14 I am trying to put together an ES Plan for the parking lot milling.We would like to keep the plan under one acre so we proposed to mill from the curbs to 20 feet out and around key-cut areas (driveways and draina
|
|
 |
Portable Turbidity Meter recommendations
|
| |
DATE:2008-05-14 12:02:58
CLICK:33
|
|
Pinwards (Civil/Environme)13 Mar 06 12:55 Anyone have recommendations for a good portable, hand-held digital Turbidity Meter.It will be used on a large construction project to manually monitor nearby stream/lake turbidity on a periodic basis, so need
|
|
 |
Erosion and Sediment Control for Parking Lot - Temporary
|
| |
DATE:2008-05-14 12:02:54
CLICK:23
|
|
cfj104 (Civil/Environme)15 Feb 06 14:48 I have a site which will be excavated in multiple phases.Upon completion of all the phases, the parking lot will be re-paved.However, I need to provide temporary ES control methods prior to final paving.There w
|
|
 |
Combatting Erosion
|
| |
DATE:2008-05-14 12:02:50
CLICK:17
|
|
tomc2506 (Electrical)15 Feb 06 13:38 Hey there, Nearby there is a section of cliffline facing extensive erosion (up to 3m a year in some parts), mostly from aerial processes (rain and the wind). The geological build up is mostly of clay, and as this
|
|
|
 |
|
Random recommended |
|
|
| |
 |
|
Related Categories |
|
|
|
Erosion control engineering
|
|
|