arabojan (Civil/Environme) 14 Mar 08 17:13
I am designing a detention storage pond (pipe storage), the pre-development flow rates are as followa:
years       pre-dev flow rate     post-dev flow rate
2            0.0000                0.6733
10           0.001                 0.9889
25           0.0245                1.2203
100          0.0959                1.4503 字串3

the required orifice for adjusting flow rate in pre development for 10 years storm event condition is 3/16 inch that is low below of the requiremnts,i want to put the orifice under the standpipe to start draining my storm runoff at the begining without accumlating any extra water in the pipes, what design measures you guys are suggesting in this case how can we model our stormwater when the peak flow at the predevelopment condition is two low, in addition infilitration is not allowed.

RWF7437 (Civil/Environme) 14 Mar 08 19:13
Just another illustration of the absurdity of many local detention "standards".

For all flows in the minimum size orifice allowed. In my geographic area, that would be 2-inches.

You can size the orifice using:

d inches = 6.166*(SQRT(Qcfs)/H(ft)^0.5)

Assuming a head of 1 foot, and a 2-inch minimum this works out to:

n =2   d < 2.00" 字串3
n=10   d < 2.00"
n=25   d < 2.00"
n=100  d < 2.00"

Your flows look VERY low. Are you sure about them ?
This must be a very small drainage area. Are you sure about the area ?
What is the minimum area for which local detention is required in your part of the world ?
By what method did you calculate such small flows ?

good luck




cvg (Civil/Environme) 14 Mar 08 19:58
and how do you get a runoff of 0.0000?

I would round everything to the nearest cfs and if less than one, round up to 1 cfs.  If you do that, you do not need any retention

arabojan (Civil/Environme) 17 Mar 08 14:06
The predevelopment area that produce such a small flow rate is small and I want to discharge my post development basin flow that is from the new building roof's area to the detention pond and then release to the discharge point of pre-development rate, I modeled the basins by pond pack and base my calculation we need a 3/8" orifice. 字串4

cvg (Civil/Environme) 17 Mar 08 15:58
I would not recommend 3/8 orifice for storm drainage as it will not function well once it gets plugged up.  Anything less than about 2" will be problematic unless you can figure out how to screen out all of the debris.  Again, I have no confidence that your Q's are accurate, hydrology is not an exact science.  


(Click:

Previous:St Lucia Design Storms?   Next:HEC-RAS : i want to calculate headloss coming from a direction change
[Add TO Favorites] [TOP] [PRINT] [CLOCE WINDOWS]  
  Hot Article
·Hydrology Software
·Calculating Open Channel Flow
·Spillway Calculation
·Pond Design Software
·Hydraulic grade line
·Calculating storage volume
·Archived Temperature data for
·SWMM5 GIS Interface: MapWindow
·Required Detention Pond Volume
·Intellisolve's Hydraflow VS En
·Breach analysis using HEC-RAS
·How to calculate 7Q20
  Related Articles
·HEC-RAS : i want to calculate
·Low flow rate
·Pump Selection for Installatio
·sheet vs sahallow flow
·Using rational method for dete
·Hec-Ras / culvert with overflo
·Help w/ HEC-RAS 4 Beta
·Modeling Overland Flow Above C
·Storm Frquency Development
·Total discharge time
·SWMM 5 rainfall problem
·Where to get Delmarva Data for
Power by DedeCms